Adani’s fresher interview process opens with a 90-160 minute written test of aptitude and branch subjects, adds a 30-minute async video round on some GET drives, then moves to a 30-60 minute technical interview on core subjects, your resume and projects, and a 20-30 minute HR conversation often run by the same panel. Panels spend most of their time on project depth and on location, shifts and fit with the business unit you want.
Adani placement process includes: 1. Online Assessment (90 minutes) - Coding/aptitude questions. 2. Technical Interview Round 1 (60 minutes) - Technical concepts. 3. Technical Interview Round 2 (60 minutes) - Advanced concepts and projects. 4. HR Interview (30 minutes) - Motivation and company fit. Total duration: 2-3 weeks from application to offer.
Round-wise process
| Round | Duration | What they test |
|---|---|---|
| Online / Written Test | 90-160 min | Aptitude + branch domain (+ basic coding on some tech drives) |
| Async video (some GET drives) | ~30 min total | Values, intro, communication under timer |
| Technical Interview | 30-60 min | Core subjects, resume, project depth |
| HR (often same panel) | 20-30 min | Location, shifts, motivation, unit fit |
Real interview experiences
Adani hires most freshers through the Graduate Engineer Trainee (GET) route across engineering disciplines, not through a CSE-only coding drive. The public write-ups reflect that: the screening is an aptitude test with a branch-specific domain section, and the interview is a short panel conversation on your branch subjects and your resume. There is very little DSA in the reported accounts.
A documented on-campus GET drive (ECE candidate)
Source: GeeksforGeeks, Adani Group GET interview experience
The most detailed public write-up is from a final-year ECE student who went through Adani’s on-campus GET drive in December 2022 and January 2023 and was selected. Four stages:
Resume screening - the shortlist was drawn before any test.
Online aptitude assessment (L&T EduTech platform)
- Four sections of 40 questions each, 40 minutes per section and 160 minutes total, with no switching between sections: Analytical Ability, Quantitative Ability, Verbal Ability, and a branch-specific domain section (ECE in this case).
- The candidate rated verbal as the easiest and the analytical and domain sections as the tougher ones.
- Roughly 40 candidates advanced out of 150+.
Asynchronous video interview (Talocity)
- A one-way recorded assessment: 5 questions, about 30 seconds of prep and up to 2 minutes to answer each, one retake allowed, with 36 hours to complete it.
- Content was a self-introduction plus questions on personal values and experiences - not technical.
Technical interview (MS Teams, ~40 minutes)
- Panel of two technical interviewers plus one HR interviewer.
- Questions spanned control systems, data science applications, networking (OSI and TCP/IP models, TCP handshake, TCP vs UDP, subnetting), cybersecurity, logic gates, and communication systems: branch fundamentals, not algorithms.
- Behavioral portion covered why Adani, what the candidate knew about its businesses, preferred division, internships, family background, and willingness to accept remote postings.
Outcome: selected. 17 offers were made across four engineering disciplines from that drive.
Takeaways
- What decided it: Branch fundamentals (control, networking, communication) plus calm async-video and relocation answers in a mixed tech+HR panel
- Common fail: Treating the Talocity one-way video as optional, or listing skills you cannot defend when the panel walks the resume
- How to practice: One full 160-minute aptitude mock; record five 2-minute video answers on a phone timer
What pooled candidate reports add
Individual Adani write-ups are sparse, so the rest is best read as pooled reporting rather than one person’s story:
- Difficulty is rated low-to-moderate. Glassdoor’s aggregate for the GET role sits near 3/5 on difficulty with about 86% of candidates calling the experience positive; across all Adani Group roles the figures are roughly 2.92/5 and 61.5% positive. GET and Software Engineer are reported as the easier Adani interviews; SDE and Assistant Manager roles are rated the hardest.
- The interview is resume-driven. The recurring advice is that interviewers ask about everything written on your resume, so do not list a skill or project you cannot defend. Reported questions include a self-introduction, why they should hire you, what you like about the group’s businesses, what you are passionate about, and why Adani - plus, in some panels, logical puzzles and questions on Python libraries.
- HR is short. Multiple reports describe only two or three HR questions, sometimes folded into the same panel as the technical round. General interviews are commonly around 25 minutes, and can end in 15 if the panel is satisfied early.
- The cycle is fast. Glassdoor’s self-reported average time from interview to outcome is about 6 days for GET and roughly 12 days across all Adani Group titles.
Takeaway: for Adani, branch fundamentals plus a defensible resume matter more than contest-grade DSA. Budget real prep time for the aptitude test - it is where the 150-to-40 cut happens - and rehearse the one-way video round, which catches candidates off guard because there is no interviewer to read.
Metallurgical GET, campus hire to a Mundra greenfield project (work-experience report)
Source: GeeksforGeeks, Adani Group work experience
Profile: Metallurgical engineer, NIT Raipur 2022, hired on campus as a GET at ₹7 LPA (candidate-reported starting CTC) for Kutch Copper Limited. The write-up covers the job after joining, not the interview.
Onboarding: about a month of induction at Mundra with 55 other GETs, covering the plant’s engineering, procurement and construction and other Adani businesses in the area; probation of 8 months, then promotion to assistant manager at ₹9 LPA in the same report (treat as one data point).
Work themes: process flow diagrams, P&ID and mechanical drawing reviews, vendor coordination for on-time delivery, tracking mechanical and civil deadlines, and budgeting and cash-flow work for the package.
Pros and cons from the report: early exposure to a plant under construction and to the business side; ~10-hour days and remote plant locations, with living costs covered by the company.
Takeaway: if you are interviewing for a core-branch GET, have an honest answer ready on remote site postings and long days.
Sources:
- Adani Group Interview Experience Graduate Engineer Trainee (GET) - GeeksforGeeks (student write-up)
- Adani Group GET interview questions - Glassdoor (pooled candidate reports)
- Adani Group interview questions - Glassdoor (pooled, all roles)
Patterns differ by campus, business unit, and year. If your college placement email says something different, follow that.
Questions that come up often
Coding / technical
- Basic array / string coding. Usually expects clear logic
- OOPs or domain follow-ups. Usually expects fundamentals
- Explain a project end-to-end. Usually expects clarity and ownership
- Discussion on domain + aptitude and basic coding, bottlenecks, failure modes, simple APIs
- Detailed project discussion, architecture, hardest bug, what you would change
HR / behavioral
- Why this company / business unit?
- Location flexibility
- How your project or internship maps to the role
- Long-term plans
Pre-interview checklist (Adani GET)
- Confirm business unit (Ports, Power, Green, Transmission, Enterprises, GET Technology) from the invite - prep differs.
- Run one full timed aptitude matching your platform (the documented drive used four timed sections of 40 questions).
- Rehearse async video answers (intro, values, teamwork) with a phone timer - 60–120 seconds each.
- Resume audit: every skill and project must survive “why did you choose X?” follow-ups.
- Prepare relocation / site posting answer before HR; it is a common filter for industrial locations.
- Pack branch fundamentals flashcards (power/mechanical/civil/ECE) - not FAANG DSA lists unless the role is technology GET.
- Bring 2 questions about induction, site rotation, and KPIs for your discipline.
Practical tips for Adani
- Clear the screening round first. Timed practice beats last-minute topic hopping.
- For domain questions, explain domain + aptitude in plain language, inputs, outputs, what breaks at scale.
- OOPs and SQL still open a lot of Adani panels. Do not skip fundamentals.
- HR answers should be concrete. One story with a result beats five slogans.
HR interview
After technical rounds, Adani usually closes with a short HR / hiring-manager conversation: motivation, location, notice period, and a couple of behavioral stories.
Sample answers for high-frequency questions
Q. Explain the Rankine cycle and where losses occur in a thermal power plant.
A. The Rankine cycle has four ideal processes: isentropic compression of feedwater in the pump, constant-pressure heat addition in the boiler and superheater, isentropic expansion through the turbine, and constant-pressure heat rejection in the condenser. Thermal efficiency is the net work divided by heat added, and it improves by raising the boiler pressure and superheat temperature or lowering the condenser pressure. Practical plants add reheat, which sends steam back to the boiler after the high-pressure turbine to reduce blade erosion from wet steam, and regenerative feedwater heating using extracted steam. Real losses come from turbine and pump isentropic inefficiency, boiler flue-gas and radiation losses, condenser terminal temperature difference, and auxiliary power consumed by fans, mills, and pumps, which is why a subcritical unit lands near 33 to 38 percent efficiency while a supercritical unit reaches the low 40s.
Q. Why does power factor matter in an industrial plant, and how is it corrected?
A. Power factor is the ratio of real power in kW to apparent power in kVA, and it equals cosine of the phase angle between voltage and current for sinusoidal supplies. Inductive loads such as induction motors and transformers draw lagging reactive power, so for the same real power the current rises, which increases I-squared-R losses in cables and transformers, causes voltage drop, and eats into transformer capacity. Utilities also levy penalties below a threshold, commonly 0.95. Correction is normally done with shunt capacitor banks sized in kVAr and switched by an automatic power factor controller, or with synchronous condensers and static VAR compensators at larger scale. Correcting from 0.75 to 0.95 cuts the current drawn by roughly 20 percent for the same load.
Q. How does a transformer work, and why can it not operate on DC?
A. A transformer works on Faraday’s law of electromagnetic induction: alternating current in the primary produces a time-varying flux in the laminated core, and that changing flux induces an EMF in the secondary proportional to its turn count, so the voltage ratio equals the turns ratio and, ignoring losses, the current ratio is its inverse. DC produces a constant flux, so the rate of change of flux is zero and no EMF is induced in the secondary; worse, the primary then presents only its small winding resistance, so the current is limited only by that resistance and the winding burns out. Transformer losses split into core losses, comprising hysteresis and eddy current losses that are roughly constant with load, and copper losses that vary with the square of load current, with maximum efficiency occurring where the two are equal.
Q. What is MPPT in a solar PV plant, and why is it needed?
A. A photovoltaic array’s power-versus-voltage curve has a single peak, and the voltage at that maximum power point shifts continuously with irradiance and, more strongly, with cell temperature, since open-circuit voltage falls by roughly 0.3 to 0.4 percent per degree Celsius. Maximum Power Point Tracking is a control algorithm inside the inverter or DC-DC converter that continuously adjusts operating voltage to sit at that peak. The common algorithms are Perturb and Observe, which nudges the voltage and keeps the direction that increased power, and Incremental Conductance, which compares incremental conductance against the negative of instantaneous conductance and handles rapid irradiance changes better. Without MPPT the array would sit wherever the load fixes its operating point and typically give up 10 to 25 percent of available energy.
Q. What is the difference between Plant Load Factor and Capacity Utilization Factor?
A. Plant Load Factor is the actual energy generated over a period divided by the energy the plant could have generated running at rated capacity for the hours it was actually available, so it measures how hard an available plant was run. Capacity Utilization Factor divides actual generation by rated capacity times all the hours in the period, whether the plant was available or not, so it also absorbs outages. For thermal plants the two differ mainly by planned and forced outage time. For renewables the distinction matters less because output is resource-limited: a solar plant in Gujarat or Rajasthan typically reports a CUF around 19 to 22 percent and a wind site perhaps 25 to 35 percent, and those numbers are the standard yardstick for comparing sites rather than plant health.
Tips from successful candidates
Assessment tips
- Confirm the current Adani pattern from the drive mail before practicing old papers
- Finish one problem or section fully before starting the next
- Revise the fundamentals listed in the round table on this page
Interview tips
- Narrate trade-offs; expect “why” after every answer
- Only list projects you can defend under follow-ups
- Prepare 3-4 STAR stories for behavioral prompts
HR tips
- Know why Adani, not just why the industry
- Be clear on location / notice period / higher studies
- Practice answers on the dedicated HR page
Sources
Outbound candidate write-ups and references:
- Adani Group Interview Experience Graduate Engineer Trainee (GET) - GeeksforGeeks
- Adani Group GET interview questions - Glassdoor
- Adani Group interview questions - Glassdoor
Cross-check the current drive mail for timings. For OA practice, see Adani placement papers.